RFP - Concrete Hangar Floor Resurfacing (20,000 Square Feet)

Aug 12, 2026

The Truckee Tahoe Airport District is now accepting proposals for the resurfacing of approximately 20,000 square feet of concrete hangar floors with a durable epoxy and polyurethane coating. Qualified contractors are invited to submit proposals by September 2, 2026.  Download Here.